PIELDS ENGINEERING
Since its inception in 2006, Pields Engineering has been delivering design, procurement, and construction services to the refinery industry.With extensive experience in refinery processes such as distillation, refining, separation, and reactions, Pields Engineering is confident in meeting customer expectations.
We have been awarded the detailed design service for the POCR Upgrading Project in Kazakhstan and are expanding our service offerings to both domestic andinternational clients.
No | Project | Client | Service | Service/construction period | Hit |
---|---|---|---|---|---|
180 | Installing NOV in No.3 LBO Plant | Yubase Manufacturing Asia Corporation | GENERAL | ongoing | 8 |
179 | GS Caltex_Structural Calculation Service Long-Term Contract | GS-Caltex Yeosu Complex | GENERAL | ongoing | 8 |
178 | Flare Load Study | Hyundai Chemical Co., Ltd | DE | ongoing | 116 |
177 | S-Oil SHAHEEN Project PKG.3 Engineering Service | Lotte Engineering & Construction Co., Ltd | DE | ongoing | 123 |
176 | Improvement of Indoor Lighting of Building in LLDPE Process | SK Geo Centric Co., Ltd. | GENERAL | 2024-12-31 | 9 |
175 | Feasibility Study of Moving Cable Tray from U/G to A/G in #3 HMP & OGT SWS Plant | S-OIL Onsan Plant | GENERAL | 2024-12-31 | 9 |
174 | Improvement of Atmospheric Release PSVs in #4 SRP Unit | SK Energy Co., Ltd. | GENERAL | 2024-12-31 | 8 |
173 | Calculation and Area Classification of Explosion Hazardous Area for Aceto Plant | TONGSUH PETROCHEMICAL CORPORATION,LTD. | BASIC | 2024-12-31 | 8 |
172 | M-Project | Korea Petroleum | EPC | 2024-12-31 | 8 |
171 | New SCR Installation of Air Heater Stack(SA-FS5901) in No.2 SAR Process | SK Energy Co., Ltd. | DE | 2024-12-31 | 115 |