PIELDS ENGINEERING
No | Project | Client | Scope of Work | Period | Hit |
---|---|---|---|---|---|
35 | Phase 19 FGRU Basic Design Project | PPI / POGC, Iran |
- Flare Preliminary Study - Flare System Study - Basic Design for FGRU System |
2018.10 ~ 2019.04 | 50 |
34 | MX REVAMP & ORP PROJECT #3 MX PLANT FLARE LOAD STUDY | HD Hyundai Oilbank |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2018.08 ~ 2019.06 | 46 |
33 | Lotte BP Chemical A Project FLARE STUDY | LOTTE E&C |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2018.08 ~ 2019.04 | 58 |
32 | Design for Flare Stack Replacement Project | Hanwha Solutions/Chemical |
- Process Simulation - Flare Load Analyzing - Network Calculation |
2018.02 ~ 2018.05 | 63 |
31 | Flare Header Flow Measuring & Vent Analysis Project | SK Energy |
- Flow Check - Flare System Study / Flare Load Calculation - Flare Network Calculation - Vent Analysis |
2017.10 ~ 2018.03 | 47 |
30 | Flare Load Study | ISU E&C |
- Flare Load Calculation - Flare Network Calculation - Flare Reduction Study |
2017.06 ~ 2017.12 | 49 |
29 | HDO #1, #2Plant, #2HOU Flare Study | Hyundai E&C |
- Flare Load Calculation - Flare Network Calculation - Flare Reduction Study |
2017.01 ~ 2017.10 | 52 |
28 | S-OIL RUC Flare Study | Daewoo E&C |
- Flare Load Calculation - Flare Network Calculation |
2015.07 ~ 2015.10 | 48 |
27 | Flare Gas Recovery Project | Tabriz Oil Refining Co. (TZORC), Iran |
- Vent Analysis - Flare Gas Recovery System Supply |
2014.06 ~ 2016.07 | 46 |
26 | CBM DEMO Project Flare Stack | Hanyang ENG |
- Flare Stack Manufacturing and Supply |
2014.09 ~ 2014.11 | 52 |