No | Project | Client | Scope of Work | Period | Hit |
---|---|---|---|---|---|
25 | LNG Terminal Flare System Study Project | Korea Gas Corporation (R&D Division) |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2013.07 ~ 2014.07 | 56 |
24 | KNPC Flare Gas Recovery Project | SK E&C |
- Flare Gas Recovery System Design |
2013.12 ~ 2014.01 | 48 |
23 | Waste Gas Flare Stack Localization | Korea Gas Corporation |
- Design of Flare Tip & Flameless Tip - Development of FFG & Panel - Pilot Test (Incl. radiation detection) |
2013.04 ~ 2013.12 | 64 |
22 | Flare System Optimization | SK Incheon Petrochem |
- Troubleshooting for Flare Surging phenomenon - Leak Detection and expulsion of its Data ba |
2013.08 ~ 2013.11 | 52 |
21 | SBS Flare System Study | LG Chem |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2013.07 ~ 2013.10 | 48 |
20 | AKKAS Flare System Study Project | Daewoo E&C |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2013.07 ~ 2013.10 | 47 |
19 | PSV & Vent Stack Capacity Review Project | LG Chem |
- Flare System Study - Flare Load Calculation - Flare Network Calculation |
2013.01 ~ 2013.03 | 81 |
18 | SKI Polymer Flare System Study | SK Innovation |
- PSV Load Evaluation / Flare Load Analyzing - Flare Header Network Calculation - Safety Instrumentation System Study |
2012.11 ~ 2013.02 | 56 |
17 | LG Chemical Flare | LG Chem |
- Flare Location Selection - Smoke problem troubleshooting |
2012.01 ~ 2012.04 | 49 |
16 | Naphtha Splitter & SIS Project | Samsung Petrochemical |
- Process Simulation - Flare Load Recalculation - SIL Calculation - Flare Basic, Detail Design |
2011.11 ~ 2011.12 | 47 |