PIELDS ENGINEERING
No | Project | Client | Scope of Work | Period | Hit |
---|---|---|---|---|---|
15 | HCP No.2 BTX Flare & PSV Project | HD HYUNDAI HEAVY INDUSTRIES |
- Process Simulation - Flare Load Analyzing - Network Calculation - Flare System Purchasing |
2011.04 ~ 2011.07 | 58 |
14 | Flare System Capacity Assessment Procurement Project | Samsung BP Chemical |
- Flare Load Analyzing - Network Calculation - PSV Sizing |
2011.03 ~ 2011.07 | 52 |
13 | Polymer Pilot Plant Flare | Samsung Petrochemical |
- Flare Load Analyzing - Network Calculation - PSV Sizing |
2011.03 ~ 2011.04 | 48 |
12 | YERP PSV Load Calculation | SK E&C |
- Flare Load Reanalyzing - Network Calculation - PSV Sizing |
2011.02 ~ 2011.07 | 50 |
11 | No.2 FCC Flare System Study Project | SK E&C |
- PSV Load Evaluation - Flare Load Analyzing - Flare Header Network Calculation |
2010.10 ~ 2010.11 | 69 |
10 | Synthetic Rubber Plant Basic Design and Flare Load Analysis Project | LG Chem |
- Flare Load Analyzing - Flare Header Network Calculation |
2009.08 ~ 2010.12 | 47 |
9 | IGD Flare Gas Project | HD HYUNDAI HEAVY INDUSTRIES |
- Flare System Basic Design (Network Calculation, etc.) - PSV Sizing |
2009.11 ~ 2010.09 | 65 |
8 | LG Chemical Flare | LG Chem |
- Process Simulation - Flare Load Reanalyzing - Network Calculation - Trouble shooting for existing Flare System |
2008.02 ~ 2008.05 / 2009.0. ~ 2009.05 (2 times) | 51 |
7 | KTIA Flare (USA) | Crown Asphalt Ridge, L.L.C. USA |
- Flare Load Analyzing - Network Calculation |
2009.07 ~ 2009.12 | 60 |
6 | GS Caltex No.4 CDU Revamping | GS E&C |
- Unit Load recalculation - Network Calculation |
2008.01 ~ 2009.05 | 47 |