PIELDS ENGINEERING
No | Project | Client | Scope of Work | Period | Hit |
---|---|---|---|---|---|
5 | GS Caltex WCN HDS Revamping | GS E&C |
- Unit Load recalculation - Network Calculation |
2007.11 ~ 2008.03 | 47 |
4 | SK ICO Flare, SIS | SK E&C |
- Flare load recalculation - SIS adoption - Network Calculation - Existing unit Flare System troubleshooting |
2007.09 ~ 2007.11 | 45 |
3 | SK Energy #2 PX Revamp Flare | SK Innovation |
- Popping Case Selection - Flare Load Calculation - |
2007.05 ~ 2007.06 | 49 |
2 | KP Chemical Flare | KP Chemical Corp. |
- Existing, New Unit Flare system Load Calculation - SIS (Instrument Flaring System) Fault Tree Analysis, SIL Calculation - ※ Unit : PX-1, PX-2, MX-1, MX-2 |
2007.03 ~ 2007.06 | 70 |
1 | YNCC #1 Flare Extension Project | Hanwha Corporation E&C Division |
- Flare Load Analyzing - Network Calculation |
2006.03 ~ 2007.05 | 58 |